- Details
- Written by Neil Ghuman
https://www.neilghuman.com/?start=20#sigProIdb6d0667697
- Details
- Written by Neil Ghuman
The property was purchased thinking it would be an easy flip. But the more I dig deeper, the further the issues I would start to find. Hence, I made an executive decision to remove all the drywall and start from scratch.
https://www.neilghuman.com/?start=20#sigProIdabd3267cbe
- Details
- Written by Neil Ghuman
https://www.neilghuman.com/?start=20#sigProIdf877642b8f
Read more: Purchase of 19522 28th Dr SE, Bothell WA, 98012 How it all Began
- Details
- Written by Neil Ghuman
I just got back from the project, took a stroll on my lunch break as I am working from home today, and this beautiful Komatsu which I rented from Sound Equipment out of Snohomish, Washington was sitting on the ground; rubber tracks and all.
This will be used to further the excavation work including but not limited to removing the ten tree stumps which did not get properly grinding down by the tree company I hired.
https://www.neilghuman.com/?start=20#sigProId62a724a869
The work continued well after dark but has been completed. We are ready for underground utilities.
Post date: 8-23-2018
Page 6 of 7